How it works

How PantryTec Works: Sign-Up to Your First Live Cycle

How PantryTec works, in one line: you sign up online, we email your first dietitian-approved menu, and your kitchen prints it and cooks from it. A new menu arrives every week after that.

See plans and pricingDownload the free 10-week sample

  • First menu within 24 to 48 hours
  • Print-ready PDFs by email
  • RD-signed menus
  • No long-term contract
Step by step

How Does PantryTec Work, Step by Step?

PantryTec works in 6 steps, from previewing a free sample menu to running the full 10-week cycle in your kitchen. You do the first three. We do the fourth. Your kitchen takes it from there.

  1. Preview a sampleDownload a free sample menu with no email required, so you can see the page your cook will work from.
  2. Choose a plan and billingPick Starter, Complete or Premier, then pay annually or monthly. If you need therapeutic diets, start at Complete.
  3. Create your accountEnter your details and your facility's details in the PantryTec Portal, agree to the terms and continue to payment.
  4. Get your first menuYour first menu arrives by email within 24 to 48 hours of sign-up, signed by a Registered Dietitian. The signature covers the weeks the menu lists.
  5. Print, post and filePrint the menu and post it. Keep a copy of the signed menu in your compliance binder. Then cook from it.
  6. Keep goingA new menu arrives every week. After week 10, the cycle starts again at week 1.

What we ask for when you sign up

The sign-up form asks about you and your facility, and nothing about individual residents. It does not ask for resident names or medical information.

Part of the formRequiredOptional
YouFirst and last name, email address, job title or role, passwordPhone number
Your facilityFacility name, street address, city, state, ZIP codeNumber of residents
Your planPlan, annual or monthly billing, agreement to the termsHow you heard about us

Already signed up? Sign in to the PantryTec Portal. Your account lives there. Your kitchen staff don't need it, because the menu they use is on paper.

What you get

What Arrives in Your Inbox, by Plan?

Every plan brings weekly dietitian-approved menus on a 10-week cycle, each signed by a Registered Dietitian, at a flat rate from $15 a month billed annually. Complete and Premier add the rest.

What each plan includes, as of November 2026
What you getStarterCompletePremier
Price billed annually$15 a month ($180 a year)$20 a month ($240 a year)$40 a month ($480 a year)
Price billed monthly$20 a month$25 a month$50 a month
Weekly dietitian-approved menus, 10-week cycleYesYesYes
RD-signed menusYesYesYes, plus re-verification as needed
Additional compliance documentsNoYesYes
Regular and common therapeutic dietsNoYesYes
Therapeutic diet portion and texture guideNoYesYes
Recipes, diet manual, food temperature logNoYesYes
Menus customized once per 10-week rotationNoNoYes
Priority adjustments and compliance guidanceNoNoYes
Long-term contract, setup fees, per-resident feesNoneNoneNone

What the menu looks like

Menus come as PDFs formatted for standard 8.5 by 11 inch paper, so you can print them on the office printer. No special equipment, no app.

Read about our dietitian-approved cycle menus for senior care, or see the full PantryTec price comparison.

One week of a PantryTec sample cycle menu, a printed page showing breakfast, lunch and dinner for each day
One week from our assisted living cycle menus. Browse sample menus by facility type and diet.
Who does what

Who Does What Once You Sign Up?

PantryTec handles the menu, and your team handles the kitchen and the residents. Nothing about the service moves resident care off your desk.

The jobWho does it
Build the menu and analyze its nutrientsPantryTec
Review the cycle and sign the menuOur Registered Dietitians
Send the next menu every weekPantryTec
Print and post the menu, file a copyYour facility
Cook, plate and scale production to today's censusYour kitchen
Record swaps in a menu substitution logYour kitchen
Match each resident to the right diet and textureYour team, following the physician's diet order
Assess residents and write care plansYour clinician, not PantryTec
The cycle

How Does the 10-Week Cycle Menu Work?

A PantryTec cycle menu holds 70 daily menus, one for each day of 10 weeks. Week 11 is week 1 again, so a resident sees 70 different days before any day repeats.

Rotation length matters because residents stay a long time. A shorter cycle repeats sooner, and people notice. Read more about planning a senior living cycle menu.

Our sample menus list one entrée per meal, which is called a non-select menu. If your license or your residents call for a selective menu with an alternate entrée, talk to us before you sign up.

Behind the menu

How Is Each Menu Made and Reviewed?

A nutrient analysis checks calories, macronutrients and micronutrients against the Dietary Reference Intakes for older adults.

Our team of Registered Dietitians and nutritionists reviews every 10-week cycle before it reaches you, and a Registered Dietitian signs the menu. Meet Bridget MacDonald, RD, or read why we built PantryTec.

Therapeutic diets

How Do Therapeutic Diets Work?

From the Complete plan up, we build common therapeutic diets from the same base cycle, including diabetic, renal, cardiac and high calorie menus, and IDDSI puree, minced and moist and soft and bite-sized textures.

Complete and Premier also include a portion and texture guide. Which resident gets which diet stays with your team and the physician's order. Starter covers the regular menu only.

Customizing

How Does Customization Work on Premier?

Premier menus can be fully customized to your facility's preferences and resident specifics once each 10-week rotation, within the dietitian's guidelines. A Registered Dietitian re-verifies them as needed.

That is how you keep resident favorites in the cycle or exclude specific allergens. Premier also brings priority adjustments and compliance guidance.

At survey time

What Do You Show a Surveyor?

You show the signed menu you posted, the copy in your binder, and your substitution log for anything you swapped. Our dietary walkthrough guide covers what surveyors look at.

The rules differ by license. Assisted living is licensed by each state, including who may review and sign menus, so check menu requirements by state or ask our team before you sign up. We will tell you how the signed menu fits your state's rule.

Certified nursing homes must still employ or contract a qualified dietitian or other clinically qualified nutrition professional under 42 CFR §483.60, who also reviews menus for nutritional adequacy.

FAQ

Questions About How PantryTec Works

Short answers to what people ask us before they sign up.

How long until we get our first menu?

Your first menu arrives by email within 24 to 48 hours of sign-up. A new menu then arrives every week.

When do we get the signed menu?

Your first signed menu arrives within 24 to 48 hours of sign-up. The signature covers the weeks the menu lists.

Is PantryTec software?

No. PantryTec is a done-for-you menu service. You have an account in the PantryTec Portal, and your kitchen works from a printed menu, so staff need no login and no training.

Do we tell you our residents' diets when we sign up?

No. The sign-up form does not ask for resident names or medical information. If you need therapeutic diets, choose Complete or Premier.

Is there a contract?

There is no long-term contract and no setup fee. You choose monthly or annual billing, and the flat rate does not change with your census.

Does the RD-signed menu work in our state?

Menu rules differ by state, including who may review and sign menus. Check our menu requirements by state guide, or ask our team before you sign up and we will tell you how the signed menu fits your state's rule.

Ready to See Your First Menu?

Plans start at $15 a month billed annually, or $20 billed monthly, with no setup fees and no long-term contract. Questions first? Call (385) 512-4731.

See plans and pricingTalk to our team